Don’t take its word for it. Test it.
Proof loading and destruction testing on our own calibrated test bed — up to 10 tonnes, assemblies up to 6 metres, single items or full batches. Certificate with every test.
Prove it, or break it
Routine proof loading keeps critical assemblies in service with confidence. Destruction testing tells you what a new design will actually take.
2× the working load, held for 2 minutes
We proof test at twice the WLL or SWL for a minimum of two minutes — tailored to your requirement where the job demands it. Recommended routinely for all critical lifting and rigging applications.
Pull it until it breaks — on purpose
Destructive pull-testing determines the actual break load of an assembly — the honest number, not the theoretical one. The right call for new designs before they go anywhere near a load.
The test bed
SPEC SHEET
Numbers you can put your name to
Put your assemblies to the test
Tell us what needs testing, the working load, and whether it’s a single item or a batch. We’ll come back with a price and a turnaround.